The pre-sales activities result in the Detailed
Project Proposal. The proposal provides the projected
timetables and key milestones that should be adhered to by all
vendors involved, as well as the user.
The detailed proposal, prepared and delivered by
the Compsee Solutions Consultant should include:
Site Requirement Document
Completed Site Survey
Recommended Hardware Configuration
Application Design Specification
Terminal Image Configuration
Detailed Bill of Materials
Deployment Procedures
Time Line Milestones
Mobility Support Requirements
Project Quotation
Line items that need to be included are
charges for the following:
Hardware Configuration - All Parts and
Accessories
Host Software
Terminal Software
Staging
Terminal Image Loading
Software Registration
Cellular Registration
Equipment Testing
Battery Charging
Kitting -
Custom Packaging and Labeling
Training
Custom Instructions
On-Site Classes
Installation Services
Network Cabling
Software Installation
System Testing
Mobility Support
Triage
Terminal Replacement
Manufacturer Warranty Repair/Services
|